Program Download; Dnp3 Communications Start-Up - Emerson PACSystems RX3i User Manual

Rsti-ep dnp3 outstation module
Hide thumbs Also See for PACSystems RX3i:
Table of Contents

Advertisement

User Manual
GFK-2911E
callout to ensure correct assignment and configuration of the Outstation parameters to the
intended EDS001 modules.
// Execute the COMMREQ on the RX3i EDS001 module
//comm_req(IN := mComreq_Setup, SYSID := iRackSlot, Task := 0, FT =>
mComreq_CallSta,
ENO => mComreq_ENO);
The COMMREQ function block parameters are described in the table below. Set values for
these parameters as required by the application.
Table 35:
Parameter
IN
SYSID
TASK
FT
ENO
6.12

Program Download

After parameters in the ST block have been set up as required by the application, the project
can be downloaded to the RX3i controller for verification and operation.
6.13

DNP3 Communications Start-up

The EDS001 module will power up and signal the user program through LIS bit 11 that it is
ready to receive the configuration parameters as defined in the ST block. LIS bit 11 and LIS
bit 13 (LAN OK) are used together in the user program to execute the one-shot signal to
configure the module with its parameters.
LAN Interface Status (LIS) bits 10, 11, and 12 are reserved for use with Ethernet applications.
Only LIS bit 11 is used with the DNP3 Outstation; reference the status information below for
operational details.
Table 36:
LIS bit 11
0
1
Configuration of DNP3 outstation Parameters
Value
Description
Location of the COMMREQ Command Block Parameters,
mComreq_Setup
always mComreq_Setup
Slot Location of the DNP3-ETM001 Module in RX3i Rack,
iRackSlot
always iRackSlot
Task Value,
0
always 0
Fault Output,
mComreq_CallSta
always mComreq_CallSta
Enable Output,
mComreq_ENO
always mComreq_ENO
Description
DNP3 Outstation is not executing.
DNP3 Outstation is executing and is ready for configuration.
Chapter 6
Sep 2019
57