BMW M5 Owner's Handbook Manual page 315

Hide thumbs Also See for M5:
Table of Contents

Advertisement

2.
Pull filler hose completely from the cover of
the sealant container. Do not kink the hose.
3.
Push the sealant container into the bracket
on the compressor housing, until it audibly
engages.
4.
Screw the filler hose of the sealant container
onto the tyre valve of the faulty wheel.
Online Edition for Part no. 01402989787 - II/18
Wheels and tyres
5.
Insert the plug into the socket in the vehicle
interior while the compressor is switched off.
6.
Switch on the compressor with standby state
switched on or the engine running.
Let the compressor run for approximately 10 mi‐
nutes to fill the sealing compound and achieve a
tyre inflation pressure of approximately 2.5 bar.
The tyre inflation pressure may rise to approxi‐
mately 5 bar during the filling process of the
sealing compound. Do not switch off the com‐
pressor during this step.
Checking and adjusting the tyre
inflation pressure
Checking
1.
Switch off compressor.
2.
Read off the tyre inflation pressure as shown
on the tyre pressure indicator.
To be able to continue the journey, a tyre infla‐
tion pressure of at least 2 bar must be reached.
MOBILITY
315

Advertisement

Table of Contents
loading

Table of Contents