Operation; Pre-Trip Inspection (Before Starting) - Carrier 69NT40-511-1 Operating And Service Manual

Container refrigeration unit
Hide thumbs Also See for 69NT40-511-1:
Table of Contents

Advertisement

4.1 PRE-TRIP INSPECTION (Before Starting)

WARNING
Beware of unannounced starting of the
evaporator and condenser fans.
a. If container is empty, check inside for the
following:
1. Check channels or "T" bars on floor for cleanliness.
Channels must be free of debris for proper air
circulation.
2. Check container panels, insulation and door seals
for damage. Effect permanent or temporary repairs.
3. Visually check evaporator fan assembly clamp
bolts for proper securement (refer to section 6.15).
4. Check for dirt or grease on evaporator fan or fan
deck and clean if necessary.
5. Check
evaporator
obstructions. Wash with fresh water.
(Refer to section 6.13.)
6. Check defrost drain pans and drain lines for
obstructions and clear if necessary. Wash with fresh
water.
7. Check panels on refrigeration unit for loose bolts
and condition of panels. Make sure T.I.R. devices
are in place on access panels.
b. Check condenser coil for cleanliness. Wash with
fresh water. (Refer to section 6.17.)
c. Check position of fresh air makeup vent cover.
Operator must determine if fresh air makeup vent
cover is to be opened or closed.
SECTION 4

OPERATION

coil
for
cleanliness
or
d. Open Partlow recording thermometer door (if so
equipped) and do the following:
1. Manually wind clock on key wound recording
thermometer (key is located in a clip.) KEY MUST
STAY WITH THE THERMOMETER. Check
battery on battery powered recording thermometer.
2. Lift stylus (pen) by pulling the marking tip outward
until the stylus arm snaps into it's retracted
position.
3. Install new chart on recording thermometer making
sure chart is under the four corner tabs. Lower the
stylus until stylus has made contact with the chart.
Then close and secure door.
e. Open Saginomiya recording thermometer door (if so
equipped) and do the following:
1. Check Chart drive battery condition.
(Refer to section 6.20.)
2. Lift stylus (pen) by pushing in the stylus lifter and
rotating the lifter clockwise (raising stylus at same
time) until lifter locks in position.
3. Install new chart on recording thermometer making
sure chart is under the four corner tabs. Release stylus
lifter
by
pushing
counterclockwise until stylus lifter locks in position
and stylus has made contact with chart. Then close
door.
f.
Open control box door. Check for loose electrical
connections or hardware.
g. Check color of moisture-liquid indicator.
h. Check oil level in compressor sight glass.
i.
Start refrigeration unit. (Refer to section 4.3.)
4-1
down
and
rotating
lifter
T-268-07

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

69nt40-52169nt40-511-199

Table of Contents