Commissioning, inspection, maintenance
Checking the outputs and actuators
The following boiler actuators can be switched, subject to the system equipment level (not required dur-
ing commissioning):
Display
"Boiler pump On"
"Boiler valve, open"
"Boiler valve, close"
"Buffer valve, open"
"Buffer valve, close"
"Prim air damper, open"
"Prim air damper, close"
"Sec air damper, open"
"Sec air damper, close"
"Central fault, open"
The following actuators of the mixer modules can be switched separately depending on the module (rec-
ommended during commissioning):
Display
"Pump On"
"Valve, open"
"Valve, close"
These actuators can also be switched if the heating circuit extension module (accessories) is used:
Display
"DHW circulation"
"DHW circulation - Pump"
"Solar"
"Solar - Pump"
"Solar - Valve, open"
"Solar - Valve, close"
Calibrating the O
Note
The Lambda probe can only be calibrated manually.
For calibrating the Lambda probe, see page 67.

Ending commissioning

Press the following keys:
1.
/
for "Yes/No"
|
~
If "Yes" is selected: the commissioning
sequence is concluded. The display changes
to the standard menu.
If "No" is selected: Commissioning is restar-
ted
30
(cont.)
Explanation
Valve on return temperature raising facility
Valve on return temperature raising facility
Buffer cylinder control valve
Buffer cylinder control valve
Test of fault alarm system connected on-site (if instal-
led).
Explanation
Explanation
Connected to the boiler at PCB HKK
Connected to the boiler at PCB HKK
probe
2
2.
d
to confirm.