Viessmann Vitoligno 300-C Installation And Service Instructions Manual page 9

18 to 48 kw pellet boiler
Table of Contents

Advertisement

Installation room requirements
Installation location requirements:
Dry, frost-proof and free of dust
High humidity levels to be avoided (e.g. caused by
continuous drying of washing)
Danger
Partial combustion due to combustion air defi-
ciency can lead to life threatening poisoning
from carbon monoxide.
Ensure an adequate supply of fresh air.
Never cover or close vents.
Floor requirements
The boiler must be positioned on a non-combustible
substrate. Special foundations are not required.
Installation requirements
The specified wall clearances are required for instal-
lation and maintenance work.
The space above the boiler must remain free for
maintenance work.
Required room height: At least 2.1 m
Minimum clearances for version with pellet supply via vacuum system
B
(100)
d
c
Fig. 1
Boiler
A
Pellet hopper
B
Recommended clearance for more convenient installation and service work
*1
A
430
(400)
a
Max. ambient temperature 35 °C
Reliable supply of fresh air
Danger
Easily flammable liquids and materials,e.g.
naphtha/petrol, solvents, cleaning agents, paints
or paper, can cause deflagration and fire.
Do not store easily flammable materials in the
boiler installation room.
Boiler technical guide
Minimum clearances
Rated heating out-
kW
put range
a
mm
b
mm
c
mm
d
mm
Minimum room
mm
height
Dimensions in brackets: Boiler with casing
Note
The specified wall clearances are required for installa-
tion and maintenance work.
Preparing for installation
6 to 18
11 to 32
8 to 24
13 to 40
16 to 48
665
835
610/850
*1
670/900
510
1800
2000
765
920
*1
570
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl3c

Table of Contents