Viessmann Vitoligno 300-C Installation And Service Instructions Manual page 38

18 to 48 kw pellet boiler
Table of Contents

Advertisement

Installation sequence
Electrical connections
Connections per extension kit
Connections
Power supply 230 V
/50 Hz
Sensor connections
Pump connection
Mixer motor connection
The distinctiveness and sequence of the extension kits
must be defined via rotary selector S1 in the extension
kit.
Extension kit
S1 rotary selector position
E1
1
E2
3
E3
5
Assignment of electrical connections on PCB (HKK) and extension kits (KM-BUS)
HKK PCB
1x HC at A1
2x HC at A1 and A2
3x HC at A1, A2 and A3
If 0x HC or 1x HC: TWE at A2
If 2x HC: TWE at A3
Note
Always connect TWE immediately downstream of HC
without a gap.
Exception: If only the TWE is connected to the HKK,
connect it at A2.
ZP, UP only at A2 or A3
ZP, UP possible in addition to TWE
SOL only at A3
Note
It is not possible to connect solar control module
type SM1.
Solar circuit at the boiler only possible if TWE or buf-
fer temperature sensors (3-5 sensors) are connected
to the Ecotronic.
38
(cont.)
for
Extension kit
Accessories
HC, TWE (return temperature sen-
sor)
TWE (cylinder temperature sensor)
HC, TWE
HC, VSB
0
0
0
Please note: Max. 4x HC can be connected in total.
Connection numbers in extension
kit
40
40A
2
17
20
52
Note
For KM-BUS connection to the PCB, see page 169.
Extension kits
1x HC at E1
2x HC at E1 and E2
3x HC at E1, E2 and E3
TWE at E1, E2 or E3
Note
Connect TWE downstream of HC without a gap.
VSB possible in addition to TWE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vl3c

Table of Contents