Preparing for installation
Handling, transport and siting
Siting
C
2x
D
Fig. 5
Lifting eyes for strap
A
Lifting eyes for raising
B
Transport aid (handle)
C
1. Undo straps and remove box.
2. Remove the parts lying on the boiler.
3. Remove 2 screws
D
4. Lift the boiler from the pallet and position it.
12
(cont.)
4x
from the base rails.
B
A
E
Screws with nuts for securing on the pallet
D
Adjustable feet
E
5. Screw in 4 adjustable feet
boiler with a slight slope (approx. 0.5°) towards the
front.
Note
The slope is required for venting the boiler.
6. Remove and retain the bag containing the boiler
type plate from the combustion chamber door.
Note
The type plate is later affixed to the right hand cas-
ing panel.
and position the
E