Installation requirements
Rated heating output range
Dimension a
Dimension b (hose length)
Min. bending radius
820
A
Fig. 4
Pellet discharge or connector at the pellet silo
A
Handling, transport and siting
Handling
Danger
Risk of injury due to the boiler being tilted or fall-
ing.
■
Only lift the boiler by the lifting eyes.
The boiler must not be lifted by the transport
■
rail or the support frame for the casing.
!
Please note
Severe jolts can damage the combustion cham-
ber and the hopper components.
Do not subject the boiler to any severe jolts dur-
ing handling and positioning.
Transporting the boiler
■
Transport the boiler to the installation location in an
upright position and, if possible, on the pallet.
■
The boiler may also be transported using a sack
truck.
The whole boiler can be raised by lifting eyes
■
See following diagram.
(cont.)
kW
mm
mm
Note
Observe the minimum bending radius of the flexible
screw conveyor.
!
.
B
Preparing for installation
6 to 18
8 to 24
min. 1500
min. 1390
Please note
The boiler can be damaged during transport with
a sack truck.
■
Only slide the sack truck under the boiler from
the front.
Secure the boiler to the sack truck with straps.
■
■
Route the straps through transport eyes
the sides.
See following diagram.
11 to 32
13 to 40
16 to 48
min. 1700
A
on
11