Monitor Unit; Radar Control Unit, Trackball Control Unit - Furuno FAR-3220-NXT Installation Manual

Chart radar
Hide thumbs Also See for FAR-3220-NXT:
Table of Contents

Advertisement

Mounting platform side
Method 1
Ground wire
Ground wire
Adhesive
Adhesive
1.2

Monitor Unit

See the operator's manual for MU-190 (OMC-44670), MU-231 (OMC-44690) or MU-
270W (OMC-44930) for the installation procedure. Keep in mind the following points
when selecting a location.
• Locate the monitor unit where no framing is installed immediately in front of the
monitor.
• Locate the monitor where the display is easily visible in all ambient lighting condi-
tions.
1.3

Radar Control Unit, Trackball Control Unit

The control units can be installed on a desktop or flush mounted in a console. For the
desktop installation the unit can laid flat or tilted.
Installation considerations
Keep in mind the following points when selecting a location.
• Select a location where the control unit can be operated easily.
• Locate the unit away from heat sources because of heat that can build up inside the
cabinet.
• Locate the equipment away from places subject to water splash and rain.
• Leave sufficient space for maintenance and service, referring to the outline draw-
ings at the back of this manual.
Note: The outline drawing number for RCU-024 and RCU-025 is different depend-
ing on the serial number, as shown below:
Hex bolt
Mounting Platform
Mounting Platform
Flat washer
Spring washer
Hex nut
Bridge window
Viewing point
Viewing point
Method 2
Flat washer
Ground wire
Ground wire
Viewing point
Viewing point
1. INSTALLATION
Adhesive
Adhesive
Hex bolt
Spring washer
Flat washer
Hex bolt
Mounting Platform
Mounting Platform
Welding
Bridge
window
1-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents