Placing Unit At Location - Trane TAM7A0A24H21SC Installer's Manual

Table of Contents

Advertisement

Placing Unit at Location

1.
Carry the unit to the installation location
2.
Reassembly by reversing the steps listed in Section 4 if
disassembly was required. If cut, wire ties that held the sensor
wiring must be replaced.
Important: Under no conditions should metal strapping be attached
to the unit to be used as support mechanisms for carrying
or suspension purposes.
Approved Carrying:
Hold by the cross members within the cabinet or unit top plate and
use as handles for lifting and carrying the coil and blower sections.
14
Unit To p Pla te
Cro s s Me m b e r
18-GJ06D2-2A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents