Section 5. Place Unit At Location - Trane GAF2A0A36S3AEC Installer's Manual

50 hz convertible air handlers 3 – 5 ton
Table of Contents

Advertisement

Section 5. Place Unit at Location

5.1 Carry Unit
STEP 1 - Carry the unit to the installation location.
STEP 2 - Reassemble by reversing the steps listed in
Section 4 if disassembly was required.
Important: Under no conditions should metal strap-
ping be attached to the unit to be used as support
mechanisms for carrying or suspension purposes.
Approved carrying:
1. Hold by the cross members within the cabinet
or unit top plate and use as handles for lifting
and carrying the coil and blower sections.
Cross Member
Unit Top Plate
GAF2
Unit Top Plate
Cross Members
GAM2
GAM2
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gaf2a0a36s3ascGam2a0c48s4ascGam2a0c60s5asc

Table of Contents