1
Combo SFP port with MGBIC installed
3.
Plug the other end of the cable into the appropriate port on the other device. Some cables may 
be terminated at the other end with two separate connectors, one for each fiber‐optic strand. In 
this case, ensure that the transmit fiber‐optic strand from the D2 is connected to the receive 
port of the other device, and the receive fiber‐optic strand on the D2 is connected to the 
transmit port of the other device.
4.
Repeat this procedure for other SFP ports, if needed.
5.
If an SFP port is unused, install a dust cover.

Installing the Optional Plastic Cover

If you have purchased a D2‐COVER‐W optional plastic cover, you can install it over a freestanding 
or wall‐mounted switch as shown in Figure

Cable Connection (LC shown) to Uplink Port with SFP Installed

Note: The optional plastic cover can be installed over a freestanding unit or a unit mounted in a
D2-WALL-MNT kit. It is not intended for use in a D2 lockbox.
2 LC cable connector
2‐27 on page 2‐34.
Enterasys D-Series Hardware Installation Guide 2-33
Installing the Optional Plastic Cover
3
Release tab

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2g124-12p

Table of Contents