Positioning Of Hook & Loop Straps To Secure Power Supply (Edge Of Tray Shown); Securing A Power Supply To The Rack Mount Tray (Edge Of Tray Position Shown) - Enterasys D2G124-12 Hardware Installation Manual

D-series
Hide thumbs Also See for D2G124-12:
Table of Contents

Advertisement

Figure 2-6
Positioning of Hook & Loop Straps to Secure Power Supply (edge of tray
shown)
1
Top power supply mounting hole
2
Bottom power supply mounting hole
3
Hook & loop straps
2.
Repeat step
1 on page 2‐6 with another hook & loop strap to secure the other side of the power 
supply to the mounting tray. Final placement is shown in Figure
Figure 2-7

Securing a Power Supply to the Rack Mount Tray (edge of tray position shown)

1
Top power supply mounting hole
2
Bottom power supply mounting hole
3
Hook & loop straps
4
DC power cord
4
Outer set of bridge anchors
5
Inner set of bridge anchors
2‐7.
5
AC power cord
6
Outer set of bridge anchors
7
Inner set of bridge anchors
Enterasys D-Series Hardware Installation Guide 2-7
Mounting the Switch

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2g124-12p

Table of Contents