INSTALLATION 2. INSTALLATION
Replacing Procedure
(1)
Turn OFF the power of the equipment, and insert the shutter into the tray.
(2)
Remove the upper rear cover and upper right-hand side cover.
(3)
Remove the bracket and plain bearing from the front of the before-sub-
scanning conveyor.
(3) [Remove]
3-E4
(4)
Remove the extension springs, and remove the housings together with the
roll bearings.
(4)#1 [Remove]
006-252-05
06.30.01 FM3040
Bracket
Plain bearing
Housing
Bearing
Extension spring
L=78.4mm
(4)#2 [Remove]
4-E6
(4)#1 [Remove]
Extension spring
L=75.9mm
Plain bearing
Housing
Bearing
FM-DP L Service Manual
B2-23.2
FRONT
FP3B0S31.EPS
FRONT
FP3B0S32.EPS
B2-23.2