10.3 Maintenance before a long stop period

10.4 Maintenance after a long stop period

FAA71+100BUV1B
Split system air conditioner
4P654517-1 – 2021.03
3 Clean the air filter. Use a vacuum cleaner or wash with water. If the air filter is
very dirty, use a soft brush and neutral detergent.
4 Dry the air filter in the shadow.
5 Reattach the air filter. Replace the air filter as it was.
6 Close the front panel. Hold the front panel by the panel tabs on both sides
and close it slowly.
7 Turn ON the power.
8 To remove warning screens, see the reference guide of the user interface.
E.g., at the end of the season.
Let the indoor units run in fan only operation for about half a day in order to dry
the interior of the units.
Clean air filters and casings of indoor units (see
Turn off the power. The user interface display disappears. When the main power
is turned on, the air conditioner will use some power, even if it is not operating.
Remove the batteries from the user interface (if applicable).
E.g., at the beginning of the season.
Check and remove everything that might be blocking inlet and outlet vents of
indoor units and outdoor units.
Clean air filters and casings of indoor units (see
Insert batteries in the user interface (if applicable).
Turn on the power at least 6 hours before operating the unit in order to ensure
smoother operation. As soon as the power is turned on, the user interface
display appears.
10
Maintenance and service
|
"10.2 Cleaning the
unit" [
"10.2 Cleaning the
unit" [
Installer and user reference guide
4
 35]).
4
 35]).
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Faa100buv1b

Table of Contents