14 About the box

14.1 Overview: About the box

14.2 Indoor unit

14.2.1 To unpack and handle the unit

FAA71+100BUV1B
Split system air conditioner
4P654517-1 – 2021.03
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
It contains information about:
Unpacking and handling the unit
Removing the accessories from the unit
Keep the following in mind:
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
Prepare the path along which you want to bring the unit inside in advance.
WARNING: MILDLY FLAMMABLE MATERIAL
The R32 refrigerant (if applicable) in this unit is mildly flammable. Refer to the
outdoor unit specifications for the type of refrigerant to be used.
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
Unpack the indoor unit completely according to the instructions mentioned on
the unpacking instructions sheet.
Use a sling of soft material or protective plates together with a rope when lifting
the unit. This to avoid damage or scratches to the unit.
1 Lift the unit by holding on to the hanger brackets without exerting any
pressure on other parts, especially on refrigerant piping, drain piping and
other resin parts.
14
About the box
|
Installer and user reference guide
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Faa100buv1b

Table of Contents