1-22
Dell PowerVault Storage Systems — Rack Installation Guide
M5 flat metal
washers (2)
M5 Phillips
pan-head
screws (2)
front of rack
Figure 1-18. Installing the Support Rails in the Rack for a DPE
d.
Secure the support rail's mounting bracket to the rack's back vertical rail
using two M5 Phillips-head pan-head screws and two M5 flat metal washers
(see Figure 1-19).
If necessary, adjust the length of the support rail by loosening the two nuts
shown in Figure 1-19, sliding the mounting bracket until the mounting
bracket fits snugly against the inside of the back vertical rail, and tightening
the two nuts.
Repeat steps a through d to install the second support rail.
support rail
vertical rail