Installation And Configuration; Unpacking Storage Center Equipment; Installing The Storage System In A Rack - Dell Storage Center SCv2000 Getting Started Manual

Hide thumbs Also See for Storage Center SCv2000:
Table of Contents

Advertisement

The Dell Storage Center Dell Storage Client Administrator's Guide describes how to use the Dell
Storage Client to manage a Storage Center.

Installation and Configuration

Before you begin installation, make sure that the site where you plan to install the storage system has
standard power from an independent source or a rack power distribution unit with a UPS.
In addition, verify that there is space in the rack to install the storage system.

Unpacking Storage Center Equipment

Unpack the storage system and identify the items in your shipment.
Figure 1. SCv2000/SCv2020 Storage System Components
1.
Documentation
3.
Rack rails

Installing the Storage System in a Rack

Install the SCv2000/SCv2020 storage system and other Storage Center system components in a rack.
NOTE: Mount the storage system in a manner that allows for expansion in the rack and prevents the
rack from becoming top‐heavy.
1.
Secure the rails that are pre-attached to both sides of the storage system chassis.
a. Lift the locking tab on the rail.
b. Push the rail towards the back of the chassis until it locks in place.
2.
Determine where to mount the storage system in the rack and mark the location at the front and rear
of the rack.
NOTE: The storage system and expansion enclosures each require 2U of rack space for
installation.
3.
Position the rails at the marked locations and extend the rails to fit the rack.
4.
Insert the top rail pin in the middle hole of the top 1U and insert the bottom rail pin in bottom hole of
the bottom 1U.
5.
Insert a screw into the top hole of the bottom 1U and tighten the screw to secure the rail to the rack.
8
2.
Storage system
4.
Front bezel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storage center scv2020

Table of Contents