Insulation; Country - Delta RPI Series Operation And Installation Manual

Grid-tie transformerless solar inverter
Hide thumbs Also See for RPI Series:
Table of Contents

Advertisement

5.2.7.2 Insulation

Before connecting to grid, inverter will measure the impedance between the PV
array and PE first. M50A models provide 4 types of impedance measurement
methods (ON, Plus Grounded, Minus Grounded, and OFF) and 2 impedance
limits. Installer must select the appropriate method based on PV array's wiring.
Inverter ID: 002
Insulation

Country

Grid Settings
5.2.7.3 Country
Each country has its own electricity regulations. Installer must select the country
correctly.
Inverter ID: 002
Insulation
Country
Grid Settings
ENT
Mode: ON
Resistance: 250kΩ
EXIT
Mode: ON
Resistance: 250kΩ
EXIT
Figure 5-11 : Insulation page
ENT
EXIT
Figure 5-12 : Country page
41
ENT
ON
Plus Grounded
Minus Grounded
OFF
EXIT
ENT
150kΩ
250kΩ
1100kΩ
EXIT
AU/NZ
Austria
Belgium
China
Turn On PV Inverter

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rpi m50a 12sRpi503m221000

Table of Contents