10. Appendix 2 Setting the Tag Data Links Using the Software
9
Select Synchronization from
the Controller Menu.
10
The Synchronization Dialog Box
is displayed.
Confirm that the data to transfer
(NJ501 in the right figure) is
selected. Then, click the
Transfer to Controller Button.
*After executing the Transfer to
Controller, the Sysmac Studio
project data is transferred to the
Controller and the data are
compared.
11
A confirmation dialog is
displayed. Click the Yes Button.
A screen stating "Synchronizing"
is displayed.
A confirmation dialog is
displayed. Click the No Button.
67