Back Gauge Solenoid Inspection And Cleaning - Ricoh StreamPunch Pro Technical & Service Manual

Hide thumbs Also See for StreamPunch Pro:
Table of Contents

Advertisement

1.4.11 Back Gauge Solenoid Inspection and Cleaning

Maintenance Schedule
Clean every 750K cycles.
Procedure
Inspect and ensure the Back Gauge solenoid linkage moves freely. Press linkage
down and release [1]. Linkage should return.
Clean out the solenoid and surrounding area with a vacuum cleaner and canned air
[2]. Make sure the solenoid is clean and dry.
Caution: The surface of the plate and solenoid bracket may be hot. Failure to observe
this caution may result in minor or moderate injury.
Note: Do not apply lubricants to the solenoid or linkage.
To remove and repair the back gauge, see "Back Gauge Assembly" on page 4.6 and
"Back Gauge Removal" on page 4.6.1.
Figure 1.19 Inspect and Clean Back Gauge Solenoid
31
[1]
[2]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch pro ex

Table of Contents