Step 4. Install the Box PC
Mount the Box PC and implement it in the automation environment.
Description
Step 4-1 Install options
Step 4-2 Mount
Step 4-3 Wire
Step 4-4 Connect
Step 5. Configure the Software
Configure Windows, install applications and download the machine control project.
Description
Step 5-1 First time startup and configure Win-
dows
Step 5-2 Configure shared folders
Step 5-3 Install Windows applications
Step 5-4 Download the machine control project
Step 6. Check and then Start Actual Operation
Configure Windows, install applications and download the machine control project.
Description
Step 6-1 Check the machine control operation
Step 6-2 Check the operation of the Windows
applications
Step 6-3 Create a system backup
Step 6-4 Start actual operation
NY-series Industrial Box PC Machine Controller Hardware User's Manual (W556)
1 Introduction to the Box PC
Reference
5-2 Install Options on page 5-5
5-3 Mount on page 5-15
5-4 Wire on page 5-27
5-5 Connect on page 5-41
Reference
•
5-6 Initial Power ON on page 5-47
•
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Setup User's
Manual (Cat. No. W568)
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Setup User's
Manual (Cat. No. W568)
•
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Software User's
Manual (Cat. No. W558)
•
Sysmac Studio Version 1 Operation Manual
(Cat. No. W504)
Reference
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Software User's
Manual (Cat. No. W558)
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Setup User's
Manual (Cat. No. W568)
NY-series IPC Machine Controller Industrial
Panel PC / Industrial Box PC Software User's
Manual (Cat. No. W558)
1
1-9