ESAB B Series Installation, Operation And Maintenance Manual page 48

Precision plasmarc system
Table of Contents

Advertisement

ð
ð
CUP SHIELD
INSULATOR SHIELD
w/RETAINER
RETAINER w/O-RING
P/N 22531
P/N 21712
MATERIAL
RISE
THICKNESS PIERCE
ON
DELAY PIERCE
(MM)
(IN)
(Sec.)
(Sec.)
4
.187
0
0
6
.250
0
0
8
.312
0
0
10
.375
.1
.1
11
.500
.2
.1
19
.625
.3
.1
NOTES:
4 Hole Baffle - *Set flow reading with valves.
CARBON STEEL
11/30/99
AMPERAGE:
PLASMA GAS:
SHIELD GAS:
SHIELD MIX GAS:
NOZZLE "D"
SHIELD CUP
INSULATOR
P/N 21543
P/N 22010
ð
ð
ð
NOZZLE RETAINER/
DIFFUSER
(SEE NOTES)
P/N 22007
SET-UP PARAMETERS*
PLASMA
PLASMA
START
CUT
(FLOW READING) (FLOW READING)
60
25
60
25
60
25
60
25
60
25
60
25
† CUT & ALT mix in flow control. Pilot Arc - high. Float - center of ball.
70
OXYGEN
NITROGEN
OXYGEN
SWIRL BAFFLE
4 HOLE
(SEE NOTES)
P/N 21692
ð
ð
ð
NOTES:
ELECTRODE
P/N 21539
SHIELD
ARC
(FLOW READING)
VOLTAGE
PRE
CUT
ALT
60
20
0
118
60
20
0
121
60
20
0
122
60
20
0
126
60
20
0
133
60
20
0
144
PROCESS DATA
PRESSURE:125 PSI/8.6 BAR
PRESSURE:125 PSI/8.6 BAR
PRESSURE:125 PSI/8.6 BAR
PT-24 TORCH
1. Assemble swirl baffle into nozzle first.
2. To prevent leakage between the nozzle and nozzle retainer,
moisten the corner of a clean, dry, lint-free cloth with a very
®
small amount of Krytox
grease P/N73585064. Wipe the
inner surface of the nozzle retainer that comes in contact with
the nozzle. Use care to apply a very thin film to ensure a
proper seal.
3. Use tool (P/N 21765) supplied with torch to remove or install
nozzle, electrode and water baffle.
TRAVEL SPEED
(MM/MIN)
(IPM)
3048
120
2540
100
2032
80
1651
65
762
30
635
25
CB70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-24

Table of Contents