ESAB B Series Installation, Operation And Maintenance Manual page 34

Precision plasmarc system
Table of Contents

Advertisement

SECTION 3
(a) Place the "plasma gas" select switch, SW-2,
in O
position.
2
(b) Place the "shield gas" select switch, SW-3,
in O
+ N
position.
2
2
(c) Place the "test switch" SW-1 in START
position.
(d) Open valve NV-3 (start gas valve) and NV-6
(shield gas pre-flow valve) approximately
two full turns.
(e) Check all gas connections on lines 2 and 5
and torch connections in junction box. Close
valves NV-3 (start gas valve) and NV-6
(shield gas pre-flow valve).
(f)
Place SW-1 in operate position to verify that
N
output pressure on right side of control
2
remains pressurized.
(g) Move switch SW-1 to CUT position.
NV-6
SW-1
NV-1
NV-2
Front View
SW-2
SW-3
NV-3
O
Pressure
2
Out
N
Pressure
2
Out
Plasma Start
Press. Out
NV-5
NV-4
Figure 3-13. Flow Control Controls
30
INSTALLATION
(h) Open valves NV-1 (oxygen plasma gas valve)
and NV-5 (cut shield gas valve) approxi-
mately two full turns.
(i)
Check all gas connections on line 1 and 4.
Recheck torch connections in junction box.
Correct as needed.
(j)
Close valves NV-1 (oxygen plasma gas
valve) and NV-5 (cut shield gas valve).
(k) Place SW-1 in operate position to verify that
O
output pressure remains pressurized.
2
(l)
Place plasma gas select switch SW-2 in N
position.
(m) Open valve NV-2 (nitrogen plasma gas) ap-
proximately two full turns.
(n) Check all gas connections on line 2 for leaks.
Correct as needed.
(o) Place SW-1 in operate position to verify that
N
output pressure remains pressurized.
2
PLASMA GAS
O
N
2
2
SHIELD GAS
N
+ALT
O
+N
2
2
2
Left Side View
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-24

Table of Contents