ESAB B Series Installation, Operation And Maintenance Manual page 32

Precision plasmarc system
Table of Contents

Advertisement

SECTION 3
E. Connect control lead (Figure 3-9) between the power
source and the flow control and from the flow control
to the junction box. See Figure 3-2 or Figure 3-3 for the
installation location.
Figure 3-8. Power Bundle/Power Source Rear
Panel Connection
CONTROL LEADS P/N'S
10 FT. (3m) P/N-21917
60 FT. (18m) P/N-21920
20 FT. (6m) P/N-21918
100 FT. (30m) P/N-21921
30 FT. (9m) P/N-21919
Figure 3-9. Available Control Lead
F. Torch Mounting Options.
1. The torch is normally mounted by the sleeve.
2. For more precise mounting, the torch can be
mounted by the 1.812" (46 mm) dia collar shown
(see Figure 3-10). This insulated collar and its
shoulder are machined relative to the nozzle
retainer thread on the torch body and is held
concentric to the cutting nozzle within a total
indicator reading of 0.010 inches (0.25 mm) or the
nozzle bore is within 0.005 inches of any point on
the 1.812 dia.
When mounting, be sure not to cover the small vent hole
in the side of the sleeve. This hole prevents coolant from
building inside the sleeve should a leak occur in a service
line.
1.812" (46mm)
Diameter Collar
Figure 3-10. Torch Mounting Options
28
INSTALLATION
NOTE
2.0" (51mm)
Diameter Sleeve
Vent Hole
COOLA
FILL CA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt-24

Table of Contents