Panasonic Inverter R32 Series Technical Data & Service Manual page 90

Table of Contents

Advertisement

When connecting to the next system unit
Forced Stop input can be transferred to the next system unit.
When using the Forced Stop input, connect the wiring to the terminal points 1 and 2 on the right side of the lower part of the terminal
block.
The maximum wire/cable length is 100 m.
The demand control cannot be transferred to the next system unit.
When transferring to the next system, the maximum number of connecting units is 30.
1.
Connecting the wining to the lower part of the terminal block.
When transferring the Forced Stop input to the next system connect the wiring (2-wire) to the terminal points 1 and 2 at the lower
right side of the terminal block.
The shield part of the shielded cable is connected with
Secure the wiring with the cord clamp located on the lower part of the terminal block.
2.
Connecting the shielded cable to the terminal block for the next system.
For the Forced Stop input, connect the wiring to the terminal points 1 and 2 at the lower right side of the terminal block.
When connecting to the next system be sure to connect to the appropriate terminal point due to the polarity.
Demand control
cannot be transferred
to the next system
Connection terminal block for
next system outdoor unit
DRM2DRM3 C
1
2
1
DRM1
Forced
To the next
Demand
Stop
system
(Functional earthing)
Connecting line to the next
Cord clamp
system outdoor unit
2
(Functional earthing)
(Functional earthing) under the terminal block.
DRM2DRM3 C
1
2
1
2
DRM1
Forced
To the next
Demand
Stop
system
(Functional earthing)
Next system
outdoor unit
Be sure to connect to the appropriate terminal point
due to the polarity.
1-10-7
(Functional earthing)
To the next system
outdoor unit
1