Installing The S-Poe-Ps Power Supplies In The Poe Subsystem; Inserting The S-Poe-Ps Power Supply In The Poe Subsystem - Enterasys S-Series Upgrade Installation Manual

Poe subsystem
Table of Contents

Advertisement

Installing the S-POE-PS Power Supplies in the PoE Subsystem

Installing the S-POE-PS Power Supplies in the PoE Subsystem
You must install the PoE subsystem on the S‐Series chassis before installing the S‐POE‐PS power 
supplies in the PoE subsystem. 
To install the S‐POE‐PS power supplies in the PoE subsystem:
1.
Open the faceplate of the S‐POE‐PS power supply by releasing the spring clip on the lower left 
of the faceplate.
2.
Align the power supply with bay 1 (labelled PS1), then slide the S‐POE‐PS power supply 
forward until the S‐POE‐PS power supply is plugged into the subsystem connector and is 
completely inside the bay. See Figure
The power supply's faceplate will close as the power supply plugs into the subsystem 
connector.
If you encounter significant resistance before the S‐POE‐PS power supply reaches the end of 
its travel, remove and reinsert the power supply.
Figure 3-1
3.
Close the power supply's faceplate completely against the spring clip on the power supply.
3-2 Installing the PoE Power Supplies

Inserting the S-POE-PS Power Supply in the PoE Subsystem

3‐1. 

Advertisement

Table of Contents
loading

Table of Contents