Removing The Rear Panels From The S-Series Chassis And The Poe Subsystem (S3 Chassis/S-Poe- 4Bay-Pwr Example); Number Of Screws To Remove - Enterasys S-Series Upgrade Installation Manual

Poe subsystem
Table of Contents

Advertisement

Installing the PoE Subsystem and the Bus Bar
5.
Remove the rear panels from both the S‐Series chassis and the PoE subsystem. See Figure
Remove only the zinc (silver) colored screws from the rear panels of the S‐Series chassis and 
PoE subsystem. Do not remove any black screws. See Table
must remove from the rear panels of each S‐Series chassis and PoE subsystem.
Table 2-2 Number of Screws to Remove
S Chassis/PoE Subsystem
S3
S4
S8
S-POE-4BAY-PWR
S-POE-8BAY-PWR
Set the panels and screws aside for reinstallation at the end of this procedure. 
Figure 2-6
(S3 Chassis/S-POE-4BAY-PWR Example)
2-8 Installing the PoE Upgrade Kit
Removing the Rear Panels from the S-Series Chassis and the PoE Subsystem
Number of Screws to Remove from the Rear Panel
16 screws
18 screws
22 screws
14 screws
18 screws (see
Figure 2-7
2‐2 for the number of screws you 
for the location of the screws)
2‐6.

Advertisement

Table of Contents
loading

Table of Contents