Poe Connectors On The Bus Bar (S3-Poe-Busbar Example) - Enterasys S-Series Upgrade Installation Manual

Poe subsystem
Table of Contents

Advertisement

9.
Install the bus bar. 
a.
Orient the bus bar so that the pairs of PoE connectors, which extend from the bus bar, face 
the backplane of the S‐Series chassis. See Figure
Figure 2-11

PoE Connectors on the Bus Bar (S3-POE-BUSBAR Example)

1
Bus bar PoE connectors must face the backplane of the S-Series chassis
Installing the PoE Subsystem and the Bus Bar
2‐11.
Enterasys S-Series PoE Subsystem Upgrade Installation Guide 2-13

Advertisement

Table of Contents
loading

Table of Contents