11. Secure the bus bar to the PoE subsystem's jumper plates with the flat washers, Belleville
washers, and socket head cap screws provided in the upgrade kit as follows (see Figure
a.
Place the flat washer against the bus bar (for the S‐POE‐4BAY‐PWR PoE subsystem) or the
front jumper plates (for the S‐POE‐8BAY‐PWR PoE subsystem).
b. Place the Belleville washer against the flat washer, with the concave side (that is, the
cupped side) of the Belleville washer against the flat washer.
c.
Insert the socket head cap screw and tighten.
Note: Torque the socket head cap screws to 67 inch pounds.
If you do not torque the socket head cap screws as specified, you may adversely affect the path of
the electrical current from the PoE subsystem to the bus bar.
d. Repeat steps a–c for each of the remaining three screw holes.
Figure 2-16
Securing the Bus Bar to the PoE Subsystem's Jumper Plates (S3 Chassis/S-
POE-4BAY-PWR Example)
1
Flat washers
2
Belleville washers (concave side facing the
flat washers)
Installing the PoE Subsystem and the Bus Bar
3
Socket head cap screws
Enterasys S-Series PoE Subsystem Upgrade Installation Guide 2-17
2‐16):