Installing the PoE Subsystem and the Bus Bar
10. Secure the bus bar to the backplane studs with the hex nuts provided in the upgrade kit. See
Figure
Figure 2-15
POE-4BAY-PWR Example)
2-16 Installing the PoE Upgrade Kit
2‐15.
Securing the Bus Bar to the Backplane Studs with Hex Nuts (S3 Chassis/S-
Note: Torque the hex nuts to 9 inch pounds.