4.
If you are installing more than one power supply, remove the coverplates from the applicable
number of power supply slots by unscrewing the captive screw that attaches each coverplate
to the PoE subsystem. See Figure
Keep the coverplates in the event you need to remove the power supplies. The PoE subsystem
ships without a cover on bay 1.
Figure 3-2
Removing a Cover Plate from the PoE Subsystem
5.
Repeat steps 1 through 3 for each additional power supply.
Installing the S-POE-PS Power Supplies in the PoE Subsystem
3‐2.
Enterasys S-Series PoE Subsystem Upgrade Installation Guide 3-3