Operation; Initialization; Manual Override - GEM 533 Operating Instructions Manual

Esystep motorized globe valve
Table of Contents

Advertisement

13 Operation

13 Operation

13.1 Initialization

Initialization must be carried out in the following situations:
Retrofitting an electrical position indicator
Replacing the actuator
Replacing the diaphragm
Initialization is already carried out for the process valve
which was fully mounted in the factory.
Initialization can be carried out using the following proced-
ures:
On-site initialization
Initialization via IO-Link
Initialization via configurable digital input (digital input
must be set to "Init")
13.1.1 On-site initialization of the end positions
1. Connect supply voltage.
2. Hold the magnet briefly (>100 ms) at the point on the
housing cover marked with PROG 1.
ð OPEN and CLOSED LEDs flash alternately.
3. Valve automatically moves into the OPEN position.
4. Valve automatically moves into the CLOSED position.
5. Initialization mode is automatically ended.
6. The end positions are set.
13.1.2 Initialization of the end positions via IO-Link
1. Select automatic initialization mode (parameter data "Ini-
tialization Mode").
2. Briefly activate (>100 ms) initialization mode (process
data "Selection of operating mode").
ð OPEN and CLOSED LEDs flash alternately.
3. Valve automatically moves into the OPEN position.
4. Valve automatically moves into the CLOSED position.
5. Initialization mode is automatically ended.
6. The end positions are set.
GEMÜ 533 eSyStep
OPEN / CLOSE (Code AE)

13.2 Manual override

Open, actuate and close the manual override with the
hexagon socket (SW3).
1. Unscrew sealing plug 2 anti-clockwise out of cover 1 and
1
2. Operate the manual override 3 with the hexagon socket
46 / 55
remove it.
(WAF3).
ð Turn clockwise to close the valve.
ð Turn anticlockwise to open the valve.
2
1
OPEN
CLOSED
3
www.gemu-group.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

533 esystep

Table of Contents