Download Print this page

ParaBody Serious Steel 425104 Assembly Instructions Manual page 36

Hide thumbs Also See for Serious Steel 425104:

Advertisement

FIGURE 40
3/8 X 2"
STEP 40
¯ Assemble one 3-1/2" PULLEY (42) around the PEC DEC CABLE (98) and to the PULLEY BRACKET
(29) using one 3/8 X 2"
(84), two 3/8" WASHERS
(91) and one 3/8" LOCKNUT
(92) as shown in FIGURE
STEP 41
Slide the ends of the PEC DEC C.A_BLE (98) into the bushings on the PEC C.MMS (24) as shown on FI GUqLE
FIGURE 41
¯ Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BtL&CKET (26) as shown
N
in FIGURE 41. (NOTE: Securely tighten the pulley connections in the CE~ TER PULLEY BRACKET
(26). The cable retaining clips
should be at approximately a 45 ~ angle.)
I/2
]
1/2
I
1/2
I
1/2
I
1/2
I
1/2
1

Advertisement

loading