Download Print this page

ParaBody Serious Steel 425104 Assembly Instructions Manual page 23

Hide thumbs Also See for Serious Steel 425104:

Advertisement

STEP 23
~ PUSH/~ULL---~
~
t.... 1/4" NUTS
SPRING PIN
"
X
I)ONOT O~,~RTIGHTE~N!
ASSEMBLY
DETAIL 25
¯ SECURELY assemble the SPRING PIN ASSEMBLY of the PUSH/PULL CABLE to the SPRING PIN B..~RREL on the RECEIV-
ING TUBE (13).
(!!!
IMPORTANT !!! TIGHTEN THE NUT OF THE SPRING PIN ASSEMBLY SECURITY)
¯
Swing the PRESS ARM (27) up until the SPRING PIN of the PUSH/PULL CABLE engages in one of the adjustment holes.
¯ Thread the second 1/4-28 IN. NUT onto the threaded end of the CABLE, and cinch the t~vo 1/4-28 IN. NUTS around the flat (IMPOR-
TAN'r! DO NOT OVER TIGttTEN NUTS!)
Use the extra thread on the end of the CABLE to adjust out slack. ( !H DO NOT ADJUST OUT TO FAR !!! ALWAYS
ALLOW
SPRING PIN ASSEMBLY TO FULLY ENGAGE)
3/8
FIGURE 26
STEP 26
¯ SECURELY
assemble the SF',AT PAD (40) to the
BACK PAD ADJUST (16) using four 3/8 X 1-1/4"
BOLTS (83) and four 3/8" WASHERS
(91).
FIGURE 26.
¯ SECURELY
assemble one 3/8:" SPRhNG PIN ASSElvl-
BLY (51) to the FRONT UPRIGHT (25) as shown
FI Gb~,E 26.
¯ Attach one 3-PRONG KNOB (61) the FRONT UPRIGHT
(25) as shown in FIGURE 26.
¯
Insert the SEAT PAD (40) & BACK PAD ADJUST
(16) into the FRONT UPI~[GtfI" (25) while pulling
.on the SPRING PIN ASSEMBLY
(51) until it engages
in one of the adjustment holes. See FIGURE 26.
1/2
[
1/2
[
2
1/2
I
1/2
3
1
23
4
I
5
6

Advertisement

loading