Lenovo ThinkSystem SR665 Setup Manual page 237

Hide thumbs Also See for ThinkSystem SR665:
Table of Contents

Advertisement

Attention:
• Read "Installation Guidelines" on page 134 to ensure that you work safely.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
A video for this task is available at:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Bz2XIeLEfGcrLGm9TSY_yt
• Youku:
http://list.youku.com/albumlist/show/id_52339612.html
Procedure
Step 1.
Touch the static-protective package that contains the hot-swap power supply to any unpainted
surface on the outside of the server. Then, take the hot-swap power supply out of the package and
place it on a static-protective surface.
Step 2.
If there is a power-supply filler installed, remove it.
Figure 112. Hot-swap power supply filler removal
Step 3.
Slide the new hot-swap power supply into the bay until it snaps into position.
.
Chapter 4
Server hardware setup
233

Advertisement

Table of Contents
loading

Table of Contents