Lenovo ThinkSystem SR665 Setup Manual page 181

Hide thumbs Also See for ThinkSystem SR665:
Table of Contents

Advertisement

Your server supports two full-height or half-height cable wall brackets on the left and right side of the system
board. The illustration shows the installation of the full-height cable wall brackets, the installation method of
the half-height cable wall brackets is the same.
Attention:
• Read "Installation Guidelines" on page 134 to ensure that you work safely.
• Prevent exposure to static electricity, which might lead to system halt and loss of data, by keeping static-
sensitive components in their static-protective packages until installation, and handling these devices with
an electrostatic-discharge wrist strap or other grounding system.
A video for this task is available at:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-Bz2XIeLEfGcrLGm9TSY_yt
• Youku:
http://list.youku.com/albumlist/show/id_52339612.html
Procedure
Step 1.
Touch the static-protective package that contains the new cable holder to any unpainted surface
on the outside of the server. Then, take the new cable holder out of the package and place it on a
static-protective surface.
Step 2.
Install the cable wall brackets.
Figure 70. Cable wall brackets installation
C
a.
Align the two holes on the system board. Install the brackets to the system board as shown.
b.
Install the two screws to secure the brackets.
After you finish
.
Chapter 4
Server hardware setup
177

Advertisement

Table of Contents
loading

Table of Contents