Miele PDR 908 EL Operating And Installation Instructions page 61

Vented
Hide thumbs Also See for PDR 908 EL:
Table of Contents

Advertisement

Installation locations
All measurements in inch (mm)
Side view
3' 8 1/2"
717
2' 4 1/4"
1100
43 1/3"
43 1/3"
Steel toe-kick
Steel toe-kick* (open or closed bases, e.g.
APCL 002, APCL 003, APCL 005,
APCL 007, APCL  011 or APCL  012)
Installation and connection
View from above
1131
Washer-dryer stack
A stacking kit (APCL 001)* is needed. This
must be installed by a Miele authorized
service technician.
* Miele accessory available to order
61

Advertisement

Table of Contents
loading

Table of Contents