Power Up The Node; Verify The Operation Of A New Part - Dell EMC PowerStore T Installation And Service Manual

Table of Contents

Advertisement

Figure 46. Installing the embedded module
2. When the embedded module is fully seated, push the release lever back into the system until the orange tab locks the lever in place.
Figure 47. Locking the release lever
3. Connect each cable into the same port from which it was removed.

Power up the node

Power up the node as described in

Verify the operation of a new part

Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you installed the new part.
3. From the Hardware card, select the view of the system where the part was installed.
The status of the new part should read Healthy. If the status is still Faulted, wait a few minutes and refresh PowerStore Manager.
If the status does not change, ensure the part is correctly seated, or call support.
Power control
procedures.
Base enclosure service procedures
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emc powerstore x

Table of Contents