Verify The Operation Of The New Part - Dell EMC PowerStore T Installation And Service Manual

Table of Contents

Advertisement

Expansion
enclosure 2
Expansion
enclosure 1
Expansion
enclosure 0
Node
Figure 19. Cabling the base enclosure to three expansion enclosures
NOTE:
For additional cabling diagrams, refer to the Cable Label Worksheet.

Verify the operation of the new part

Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you installed the new part.
3. From the Hardware card, select the view of the system where the part was installed.
The status of the part should read Healthy. If the status is Faulted, wait a few minutes and refresh PowerStore Manager. If the
status does not change, ensure the part is correctly seated, or call support.
26
Install a new base enclosure and optional expansion enclosure
B
A
B
A
B
A
B
A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emc powerstore x

Table of Contents