Connection Assignment Of The Encoder - Siemens SIMOTICS M-1FE1 Configuration Manual

Synchronous built-in motors for sinamics s120
Hide thumbs Also See for SIMOTICS M-1FE1:
Table of Contents

Advertisement

Electrical connection
8.3 System integration
Connecting the PTC and Pt1000 to SME120
Note
SME120
Additional information about connecting-up and operating the SME120 is provided in the
Equipment Manual for the Control Units and supplementary system components.
Note
Before you commission the motor, carefully check that the shutdown circuit via the PLC
(programmable logic controller) functions correctly.
8.3.3.2

Connection assignment of the encoder

Note
The encoder is not included in the scope of delivery of the motor.
More detailed information is provided in the SINAMICS documentation.
126
SIMOTICS M-1FE1 synchronous built-in motors
Configuration Manual, 09/2019, A5E47872980B AA

Advertisement

Table of Contents
loading

Table of Contents