13.1.4 Installation of damping devices

※ Damping devices must be provided between the unit and its foundation.
By means of the Φ15mm diameter installation holes on the steel frame of the unit base, the unit can be
fastened on the foundation through the spring damper. See figure above (Schematic diagram of installation
dimension of the unit) for details about center distance of the installation holes. The damper does not go with
the unit, and the user can select the damper according to the relevant requirements. When the unit is
installed on the high roof or the area sensitive to vibration, please consult the relevant persons before
selecting the damper.

※ Installation steps of the damper

Step
Make sure that the flatness of the concrete foundation is within ± 3mm, and then place the unit on the
1
cushion block.
Raise the unit to the height suitable for installation of the damping device. Remove the clamp nuts of the
2
damper.
Place the unit on the damper, and align the fixing bolt holes of the damper with the fixing holes on the unit
3
base.
4
Return the clamp nuts of the damper to the fixing holes on the unit base, and tighten them into the damper.
Adjust the operational height of the damper base, and screw down the leveling bolts. Tighten the bolts by
5
one circle to ensure equal height adjustment variance of the damper.
6
The lock bolts can be tightened after the correct operational height is reached.
Damping device

13.2 Water System Installation

Notice:
● After the unit is in place, chilled water pipes can be laid.
● The relevant installation regulations should be abided with when conducting connection of water pipes.
● The pipelines should be free of any impurity, and all chilled water pipes must conform to local rules and
regulations of pipeline engineering.

13.2.1 Connection requirements of chilled water pipes

65/80kW
Content
Installation bolt M12
Nut
Ferrol
91
MCAC-ATSM-201606
130kW
Fixed meatal
plate