General - Barco Prometheus III Installation Manual

Table of Contents

Advertisement

General

About this chapter
Read this chapter before installing your Prometheus III. It contains important information concerning
installation requirements for the Prometheus III, such as minimum and maximum allowed ambient
temperature, humidity conditions, required safety area around the installed projector, required power net, etc.
Furthermore, careful consideration of things such as image size, ambient light level, projector placement and
type of screen to use are critical to the optimum use of the projection system.
About Prometheus IIIs
PROMETHEUS III
Barco provides a guarantee relating to perfect manufacturing as part of the legally stipulated terms
of guarantee. Observing the specification mentioned in this chapter is critical for projector
performance. Neglecting this can result in loss of warranty.
After unpacking let the projector acclimatizes to a room temperature higher then 10°C (50°F) and
lower then 35°C (95°F). It is suggests only using it after having stored it for 16 hours in final location.
Neglecting this may result in a start up failure of the Light Processor Unit.
Overview
Installation requirements
About the delivered packages
Unpacking the projector
Initial inspection
2
R5906897 /02
Prometheus III
21

Advertisement

Table of Contents
loading

Table of Contents