Chapter 4: Preinstallation Checklist; Preinstallation Checklist - Avaya VSP 7200 Series Installing Manual

Virtual services platform
Table of Contents

Advertisement

Chapter 4: Preinstallation checklist

Preinstallation checklist

Before you install the Avaya Virtual Services Platform 7200 Series, make sure that you complete the
tasks in the preinstallation checklist.
Important:
Make sure the air flow direction of your power supplies and fan modules match the same
direction (either front-to-back or back-to-front).
No.
Task
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
3.
Verify that the fan module air flow is
going in the same direction as the
power supplies (either front-to-back or
back-to-front). Optionally order
redundant fan modules.
4.
Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ-45 console port cable
• ESD cable
5.
Unpack the equipment.
November 2016
Description
For the physical, electrical, and environmental
specifications, see
page 19.
See
AC power supply specification
page 24 or
specifications
To order redundant PSUs, see
models for VSP 7200 Series
numbers.
To order redundant fan modules, see
Hardware models for VSP 7200 Series
page 8 for part numbers.
See
Cable requirements for the VSP 7200
Series
on page 72.
Observe ESD precautions when you unpack
the equipment. See
page 18.
Installing the Avaya VSP 7200 Series
Comments on this document? infodev@avaya.com
Technical specifications
on
DC power supply
on page 31.
Hardware
on page 8 for part
Electrostatic discharge
on
on
on
Table continues...
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents