Avaya VSP 7200 Series Installing Manual page 15

Virtual services platform
Table of Contents

Advertisement

No.
Task
6.
Verify the contents of the shipped
package.
7.
Make sure that the power cord has the
correct country-specific termination.
8.
Prepare the rack.
November 2016
Description
See
Package contents
description of the components that are
provided with the switch. If any components
are missing, contact Avaya support at
support.avaya.com/.
Ensure that there is enough rack space to
accommodate a 1RU switch (4.45 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Ensure that the rack is grounded to the same
grounding electrode used by the power service
in the area. The ground path must be
permanent and must not exceed 1 Ohm of
resistance from the rack to the grounding
electrode.
Installing the Avaya VSP 7200 Series
Comments on this document? infodev@avaya.com
Preinstallation checklist
on page 21 for a
http://
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents