Greasing The Roller Bearings Prior To Commissioning - Siemens SIMOTICS FD 1LL1 Operating Instructions Manual

Induction motor
Table of Contents

Advertisement

7.3

Greasing the roller bearings prior to commissioning

The following information assumes that the specified storage conditions have been complied
with.
General specifications
● Pay attention to the instructions on the lubricant plate.
● Regrease in portions. The shaft must rotate so that the new grease can be distributed in
Regreasing the roller bearings prior to commissioning
● If the period between delivery and commissioning is more than a year and less than four
Regreasing roller bearings before commissioning
You must regrease the roller bearings under the following conditions:
● If the machine has been in storage for more than four years.
● If the machine has not been stored in accordance with the specifications in the "Storage"
Procedure
1. Remove the bearing, regreasing pipes, grease nipples and the bearing cap.
2. Flush out the old grease.
3. Check the bearings before regreasing. If necessary, install new bearings.
4. Lubricate the bearings and reinstall the bearing components.
See also
Regreasing intervals and types of grease for operating roller bearings (Page 117)
Stoppages (Page 107)
Transport and storage (Page 34)
SIMOTICS FD 1LL1
Operating Instructions 04/2016
the bearings.
years:
– Re-grease the roller bearings with twice the amount of grease specified on the lubricant
plate.
– Check the bearing temperature, as far as possible.
section.
7.3 Greasing the roller bearings prior to commissioning
Start-up
93

Advertisement

Table of Contents
loading

Table of Contents