Getting Started
2.2 Project example
Figure 2-4
Dialog 2
MCS and WCS values are displayed in the second dialog. The dialog also contains examples
of progress bars with and without color change.
Figure 2-5
16
I/O field with integrated unit selection
Progress bars with (right) and without (left) color change
SINUMERIK Integrate Run MyScreens (BE2)
Programming Manual, 12/2017, 6FC5397-1DP40-6BA1