Removing An Mx2000 Single-Phase Ac Power Distribution Module - Juniper MX2020 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

16. Screw the retaining nut onto the AC power cord to secure it to the metal wiring compartment.
17. Reinstall the metal PDM wiring cover, and using a number 2 Phillips (+) screwdriver, tighten the four
captive screws on the metal AC wiring compartment.
18. Verify that the AC power cord is not touching or blocking access to router components, and that it
does not drape where people could trip on it.
19. Remove the ESD grounding strap from the ESD points on the chassis. Connect the strap to an approved
site ESD grounding point. See the instructions for your site.
20. Connect the AC power cord plug to the power source.
21. Switch on the customer-site circuit breakers to provide voltage on the AC power cord.
22. Remove the ESD grounding strap from the approved site ESD grounding point. See the instructions
for your site. Reconnect the strap to one of the ESD points on the chassis.
23. Verify that the LED on the PDM faceplate is lit steadily, indicating that the AC terminal block is receiving
power.
RELATED DOCUMENTATION
MX2000 Three-Phase AC Power Electrical Safety Guidelines
Connecting AC Power to an MX2000 Router with Three-Phase Wye AC Power Distribution
Modules | 300
MX2000 Three-Phase Wye AC Power Distribution Module Description | 98
MX2000 Three-Phase Delta and Wye AC Power Distribution Module LEDs | 103
Troubleshooting the MX2000 Router Power System | 686

Removing an MX2000 Single-Phase AC Power Distribution Module

Before you remove a single-phase AC PDM, be aware of the following:
383

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents