Securing The Rail Assembly For A 2-Post Mid-Mount Configuration; Securing A Flush Mount Rail Assembly - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

2-Post Rack Mount Installation
Figure C-10
1
Rack appropriate screws of fasteners (8)

Securing the Rail Assembly for a 2-Post Mid-Mount Configuration

When securing the rail and mid-bracket assembly in a mid-mount configuration:
1.
Ensure that a cage nut is installed in the rail ear square opening as described in
to Rail 7.25 Inch Flush Mount or Mid-Mount
2.
Align the mid-bracket ear openings with the outer front flange rack post openings as shown in
Figure C-11
3.
Secure the rail assembly with two screws or fasteners appropriate to the rack at both the rail
ear and mid-bracket ear
C-12 Optional Rack Mount Rail Kit Installation

Securing a Flush Mount Rail Assembly

on page C-13
Assembly" on page C-10
"Mid-Bracket