Securing The Rail Assembly For A 2-Post Flush Mount Configuration; Securing Mid-Bracket To Rail 7.25 Inch Flush Mount Or Mid-Mount - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

Figure C-9
1
Four screws from extension rack assembly
2
Mid-bracket

Securing the Rail Assembly for a 2-Post Flush Mount Configuration

When securing the rail and mid-bracket assembly in a flush mount configuration:
1.
Align the rail ear circular openings with outer front flange rack post openings and the
mid-bracket ear openings with outer rear flange rack post openings as shown in
on page C-12
2.
Secure each rail assembly with two screws or fasteners appropriate to the rack at both the rail
ear and mid-bracket ear

Securing Mid-Bracket to Rail 7.25 Inch Flush Mount or Mid-Mount

3
Rail ear square opening
4
Cage nut (mid-mount configuration only)
Enterasys 7100G-Series Hardware Installation Guide C-11
2-Post Rack Mount Installation
Figure C-10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

71g21k2l2-48p71g11k2l2-4871g21k2l2-24p24

Table of Contents