Figure C-9
1
Four screws from extension rack assembly
2
Mid-bracket
Securing the Rail Assembly for a 2-Post Flush Mount Configuration
When securing the rail and mid-bracket assembly in a flush mount configuration:
1.
Align the rail ear circular openings with outer front flange rack post openings and the
mid-bracket ear openings with outer rear flange rack post openings as shown in
on page C-12
2.
Secure each rail assembly with two screws or fasteners appropriate to the rack at both the rail
ear and mid-bracket ear
Securing Mid-Bracket to Rail 7.25 Inch Flush Mount or Mid-Mount
3
Rail ear square opening
4
Cage nut (mid-mount configuration only)
Enterasys 7100G-Series Hardware Installation Guide C-11
2-Post Rack Mount Installation
Figure C-10